St. Gotthard base railway tunnel - Switzerland

Project: St. Gotthard base railway tunnel - Switzerland

Period: 1995 - in progress

Services provided: For the whole tunnel: feasibility studies, Preliminary project / For the Bobio, Faido and Sedrun sections: Tender base design, Final design, Invitation to tender, Construction supervision, Documentation of the realized works

Person in charge: Davide Fabbri

Technical sheet:

086_lombardi_alptransit.jpg

 
Chespí-Palma Real HPP - Ecuador

Project: Planta hidroeléctrica Chespí-Palma Real - Ecuador

Period of services: 2009 - in progress

Services provided: Feasibility study, Preliminary design, Final design, Tender documents, supervision of the on-site investigations

Person in charge: Roger Bremen

Technical sheet:

p6100013.jpg

 
Wysswasser HPP - Switzerland

Project: Wysswasser HPP

Period of services: 2010 - in progress

Services provided: Feasibility study, final design, tender documents, construction drawings, assitance to site supervision

Person in charge: Felipe Lazaro

Technical sheet:

wysswasser.jpg

 
Vedeggio-Cassarate Tunnel - Switzerland

Project: Lugano regional transport plan (PTL), Vedeggio-Cassarate Tunnel

Period: 2004 - 2012

Services provided: Design competition, Outline design, Construction and site supervision

Person in charge: Matthias Neuenschwander

Technical sheet:

vedeggio_cassarate_ptl_geofoto.jpg

 
Toachi-Pilatón HPP - Ecuador

Project: Toachi-Pilatón Hydropower Plant - Ecuador

Period: 2009 - 2012

Services provided: Final design, Tender documents, in-situ investigations supervision, construction design of the Toachi dam

Person in charge: Roger Bremen

Technical sheet:

p6100013.jpg

 
Koralm Tunnel - Austria

Project: Koralm-Line Graz – Klagenfurt
Koralm Tunnel

Period: 2006 - in progress

Services provided: Preliminary design, Tender documents, Final design of tunnel

Person in charge: Davide Fabbri

Technical sheet:

p1000680.jpg