Total Renovation of the Lucerne Cityring (2012)

Neidhart M., A., Koch F.


Rock-mechanical aspects during the design stage of large caverns (2012)

Amberg F.


Felsmechanische Aspekte bei der Projektierung von grossen Kavernen (2012)

Amberg F.


Design and construction of the 5.5 km TBM excavated headrace tunnel of the Theun Hinboun Expansion Project, Lao PDR (2012)

Sayah S., Crapp R., Babini C., Andreis I.


Tunnel des Oudayas, Rabat- Suivi de l'excavation sous les bâtiments historiques (2011)

Panciera A., Gubler G.


For a correct interpretation of ground reaction curves (2011)

The Gibraltar Tunnel: the design revision (2010)

Panciera A., Bensaid A., Roca F.


Ein alter Traum: Der Tunnel unter der Meerengen von Gibraltar (2010)

Lombardi G.


Complexity-Security-Responsibility in the Tunnel Operation (2010)

Grässlin U.


Complexity-Security-Responsibility in the Tunnel Operation (2010)

Grässlin U.


The Oudayas tunnel (Marocco) A challenging passage under historical buildings (2010)

Panciera A., Hamich M.B.


Ein alter Traum. Der tunnel unter der meerenge von Gibraltar (2010)

The Oudayas Tunnel. A challenging passage under historical buildings (2010)

Panciera A., Hamich H.B.


The Gibraltar Tunnel: Project presentation and challenges, Tuneis (2010)

Lombardi AG


Gibraltar Tunnel. Projektaktualisierung geomechanische Herausforderungen (2009)

Lombardi G., Neuenschwander M,
Panciera A.


Konzepte zur Bewältigung druckhafter gebigrsverhältnisse beim Koralmtunnel (2009)

Keiper K. & others


Gibraltar tunnel Projektaktualisierung geomech Herausforderungen (2009)

Lombardi G., Neuenschwander M., Panciera A.


Konzepte zur Bewältigung druckhafter Gebirgsverhältnisse Koralmtunnel (2009)

Fabbri D., Keiper K., e altri


Tunnel excavation in an urbanized area under heterogeneous loose ground and extreme hydro-geological conditions (2009)

Numerical simulations of tunnelling in soft rock under water pressure (2009)

L'evoluzione dell'arte di costruire (2008)

Lombardi G.


Konzeptionelle Überlegungen zu den maschinellen Vortrieben beim Koralmtunnel (2008)

Fabbri D., e altri


Erfahrungen bei der TBM-Vortriebe im Gotthard-Basistunnel TA Bodio (2008)

Ferrari A., Pedrazzini S.


The Gibraltar Tunnel: project presentation and challenges (2008)

Panciera A.


Experiences with TBM drives in the Gotthard Base Tunnel, Bodio section (2008)

Ferrari A., Pedrazzini S., e altri


Erfahrungen bei der TBM-Vortriebe im Gotthard- Basistunnel Teilabschnitt Bodio (2008)

Ferrari A., Pedrazzini S., e altri


Refurbishment in squeezing ground in large scale: Lesson Learned
from the Southern Section of the Gotthard Base Tunnel (2008)

Bachmann T., Vicenzi I.


Härtestabilisation Erfahrungen aus dem baulos Bodio des Gotthard-basistunnel (2008)

Fabbri D., Ferrari A., Keiper K.


Deep tunnelling hardrock with large diameter TBM, An experience from the Gotthard base tunnel (2007)

Vincenzi I., Pedrazzini S., Ferrari A., e altri


Safety doors int the world's longest tunnel under the Gothard (2007)

Fabbri D., Strassi C., Peggs S.


Tunnel Vedeggio Cassarate Vortrieb im wassergesättigtem Lockergestein (2008)

Como G., Ferrari A., Gubler G.


Evoluzione della costruzione di opere sotterranee (2007)

Lombardi G.


Evoluzione della costruzione di opere sotterranee (2007)

Lombardi G.


Evolucón en la construcción de obras subterráneas (2006)

Lombardi G.


Evolución en la construcción de obras subterráneas (2006)

Lombardi G.


AlpTransit: la gestione dei rischi di un grande progetto (2005)

Neuenschwander M.


Geologische Risiken und Massnahmen - Symposium Geologie AlpTransit GEAT 05 (2005)

Lombardi G.


Tunnelling in Switzerland: from long tradition to the longest tunnel in the world (2005)

Henke A.


Le Saint Gothard. Dossier Tunnels Transalpins. Les trois grands: Saint Gothard, Lötschberg et Maurienne-Ambin (2004)

Lombardi G., Duffaut P., Schneider T.R.


Kosten im Tunnelbau: vom Voranschlag zum Endpreis (2004)

Lombardi G.


Experiences with TBM drives in the Gotthard Base Tunnel Bodio Section (2008)

Ferrari A., Pedrazzini S.


Konzeptionelle Überlegungen zu den maschinellen Vortrieben beim Koralmtunnel (2008)

Fabbri D, Keiper K, Handke D.


Härtestabilisation - Erfahrungen aus dem Baulos Bodio des GBT (2008)

Fabbri D., Ferrari A., Keiper K.


Refurbishment in squeezing ground on large scale: lesson learned from the southern section of the Gotthard base tunnel (2008)

Vicenzi I., Bachmann T.


Bewältigung von unerwarteten Störzonen beim TBM-Vortrieb im Gotthard-Basistunnel Baulos Bodio (2007)

Ferrari A., Fabbri D., Sidler M.


Gotthard and Ceneri base tunnels, Bodio part section (2007)

Ferrari A., Pedrazzini S.


Detailed seismic analyses for Bolu tunnel (2007)

Russo M., Solak T., Akıs E.


Bewältigung von unerwarteten Störzonen beim TBM-Vortrieb im Gotthard-Basistunnel Baulos Bodio (2007)

Fabbri D., Sidler M., Ferrari A.


Bewältigung unerwartete Störzonen beim TBM Vortrieb im GBT (2007)

Ferrari A., Fabbri D., Sidler M.


Deep tunneling in hardrock with large diameter TBM: what's up (2007)

Pedrazzini S., Ferrari A., Gubler G., Vicenzi I., Böckli O.


Tunneliers en zones instables (2006)

Ferrari A.


Der Tunnel Engelberg – Unwetter Untertag (2006)

Reber T.


Excavation, using TBM, of the longest rail tunnel of the world concepts and experiences (2006)

Henke A.


Progetto civile della galleria Vedeggio-Cassarate (2006)

Como G.


La gestione del cantiere (Galleria Vedeggio-Cassarate) (2006)

Neuenschwander M., Spinedi P.


Experiences from the ground probing in the Gotthard-Base Tunnel and their applicability in the Gibraltar Strait Crossing (2005)

Henke A.


Experiences from the ground probing in the Gotthard-Base tunnel (2005)

Fabbri D.


The importance of the safety aspects during the construction works for the new major alpine tunnels related to the safety during the regular service phase. Parallelisms and differences (2005)

Fabbri D., Pedrazzini S.


The Gotthard Base Tunnel: fire / life safety system (2004)

Fabbri D.


Le coût des tunnels: du devis estimatif au décompte final (2004)

Lombardi G.


The Gotthard Base Tunnel: project overview (2004)

Fabbri D.


The 2001 Gotthard road tunnel fire (2004)

Henke A., Gagliardi M.


Sistema di controllo strutturale e monitoraggio in opera nel Traforo del Monte Bianco (2004)

Russo M., Mordasini A., Doucet J.


Kirchenwaldtunnel A2/A8: Tunnelbau unter schwierigen Bedingungen (2003)

Theiler A.


Concetto di ricognizione per l'avanzamento fresato nella tratta di Bodio (2003)

Fabbri D.


Optimierung der Ortbetonsohle beim TBM-Vortrieb im Teilabschnitt Bodio (2003)

Fabbri D.


I lavori principali della galleria di base del San Gottardo sul territorio ticinese (2003)

Henke A.


La sicurezza in galleria. Riduzione attiva del rischio. (2003)

Bettelini M.


PTL - Piano dei trasporti del luganese: Realizzare un sistema integrato dei trasporti: la galleria Vedeggio-Cassarate (2002)

Spinedi P., Gorla A., Mauri T., Bettelini M., Bonzanigo L., Gianola G.


Gotthard-Basistunnel TA Bodio, Los 553: Bergmännischer Vortrieb im Lockergestein (2002)

Rondi L., Theiler A.


Tunnelling in rockfall deposits - Dealing with extreme asymmetry (2002)

Rondi L., Theiler A.


Brandschäden im Gotthard-Strassentunnel (2002)

Henke A.


Les risques géotechniques dans l'évaluation financière des tunnels non urbains (2002)

Lombardi G.


Mont Blanc Fire Safety (2002)

Bettelini M.


Brandklappen zur Optimierung des Lüftungssystems (2002)

Bettelini M.


Smoke management in longitudinally ventilated road tunnels (2002)

Bettelini M., Henke A., Spinedi P.


Instandsetzung von Tunnelabschnitten im Hochtemperaturbereich am Beispiel des Gotthard-Strassentunnels (2002)

Henke A.


Ventilation du tunnel routier du St Gothard. Adaptation orientée à l'augmentation du trafic des poids lourds (2002)

Henke A.


Geotechnical risks for project financing of tunnels in non-urban areas (2001)

Lombardi G.


Le tunnel de base du St. Gothard sud – Concept d'avancement et dispositions logistiques déterminés par le respect de l'environnement (2001)

Henke A.


Seismic design of underground structures – The Bolu tunnel (2001)

Amberg W., Russo M.


Upgrading the Swiss North-South route: Kirchenwald tunnel – Turning the mountain between the lakes into Swiss cheese (2001)

Reber T.


20 anni Galleria Stradale San Gottardo - Idee e progetti: passato, presente e futuro (2000)

Lombardi G.


Some considerations on underground openings in urban areas (2000)

Lombardi G.


AlpTransit - La combinaison des différentes méthodes d'avancement et des attaques intermédiaires dans le secteur sud (2000)

Henke A.


Considérations générales sur la comparabilité des coûts (1999)

Lombardi G.


Learning from real events, Dealing with truck fires in St. Gotthard road tunnel (1999)

Henke A., Gagliardi M.


Begehung der Ständerätischen Kommission in Polmengo vom 16.09,1997. Das Projekt des Gotthard-Basistunnels (1997)

Lombardi G.


Alptransit - vom einschaligen zum zweischaligen Ausbau (1997)

Henke A.


Galeries industrielles et contournement routiers à Lugano et Locarno (1997)

Lombardi G.


Risanamento della galleria a seguito dell'incendio del 31.10.1997 (1997)

Mordasini A.


Galleria di Base del San Gottardo - Lavori di sondaggio zona della Piora (1995)

Lombardi G.


Progettazione delle opere in sotterraneo (1994)

Lombardi G.


Le gallerie dell'attraversamento della città di Neuchâtel con la strada nazionale N5 (1993)

Henke A.


Road Tunnel Management - Final report of the OECD seminar, Gestion des tunnels routiers (1992)

Henke A.


Impianto idroelettrico di generazione e pompaggio di Presenzano (1989)

Ente Nazionale per l'Energia Elettrica


Stratégie pour l'équipement des tunnels: L'expérience suisse (1989)

Henke A.


Gebirgsfestigung in den Portalzonen des Tunnels N5-Ost, Neuenburg (1988)

Henke A.


Particularité des grandes cavernes (1986)

Lombardi G.


Les tunnels de la N5 à Neuchâtel - Le projet des Tunnels Est (1985)

Lombardi G.


Progetto e studi di fattibilità per la realizzazione del laboratorio di fisica sub-nucleare in caverna sotto il Gran Sasso (1985)

Lombardi G., Leonardi L., Lunardi P., Marini F.


Der Gotthard-Basistunnel - Piora-Mulde (1983)

Diethelm W.


Galleria stradale del San Gottardo: problemi di pressione delle rocce durante la costruzione (1977)

Lombardi G.


Tunnel du Gothard: Problèmes de pression de la roche pendant la construction du tunnel routier (1976)

Lombardi G.


Gotthardtunnel: Gebirgsdruckprobleme beim Bau des Strassentunnels (1975)

Lombardi G.


Felsmechanische Probleme am Gotthard (1974)

Lombardi G.


Publications by year

Filter (Chronologic, Decades)
2010 - 2019>>
2010(10)
2011(2)
2012(5)

Keyword (Title, Author, ...)

Imprint | Sitemap | Print | System by cms box | Login

Thursday, 23. May 2013