Lombardi SA -

EN | IT | DE | FR | ES
  • Home
  • Lombardi GroupCurrently selected
  • Services
  • References
  • Publications
  • Innovation
    • Foundation
    • R & D
  • About us
  • OrganisationCurrently selected
  • History
  • Governance
  • Job opportunities
  • News
  • Contacts

Organisation

Page Content

​​Organisation

 News

ID
  
Title
  
Body
Start Date
  
Expires
  
75Award of the mandate “3D modelling for the project to clear the former Mitholz ammunition depot”

In a hard-fought competition, we won the mandate “3D modelling for the project to clear the former Mitholz ammunition depot” on behalf of armasuisse Immobilien.
The promising mandate is a cross-sectional assignment covering all planned work and includes 3D modelling to accompany all planning and realisation works. In addition to the comprehensive modelling (also in BIM) of the construction measures, the existing structure as well as the topography, geology and hydrogeology must also be integrated into the overall model.
We are very happy about the great success of this competition and to be able to contribute to the achievement of this complex project!

30/06/202230/06/2023
74Lima: The megacity moves forward with Line 2

​Last January saw the successful completion of the excavation by TBM of the first section of the future line 2 of the Lima metro, which began in September 2021. Line 2 will connect one of the largest agglomerations in South America.
On 26 January, the "breakthrough ceremony" of the TBM "Delia" at the Circunvalación station in the busy district of San Luis was celebrated, marking the end of the first stage after 720 m of excavation from the San Juan de Dios station.
Line 2, with an extension of 27 km that includes 27 stations, will drastically improve the mobility of the citizens of the capital of Peru thanks to the connection of the district of Ate with that of Callao.
Lombardi is proud to assist the Construction Consortium M2 Lima in its on-site technical assistance mission, which also includes design activities, monitoring and analysis of the excavation of the 17 km carried out with TBM. ​

30/05/202230/06/2023
72Switzerland's largest alpine solar plant produces electricity

The Swiss Energy Strategy 2050 focuses on renewable energy. For this energy transition, more electricity must also be produced in winter to close the so-called winter electricity gap. This is precisely where the pioneering project in the Alps comes in.
Switzerland's largest alpine solar plant at 2500 metres above sea level was partially commissioned at the end of 2021. The pioneering AlpinSolar project is expected to produce 3.3 million kilowatt hours of electricity per year from August 2022 - half of it in winter. In this way, solar energy is used at any time of the year and despite the “sea of fog”.
Lombardi is proud to have been entrusted by AlpinSolar Ltd. with the design services for the technical centre of the photovoltaic system for this pioneering project. The services included the SIA phases 32, 41 and 51 to 53 for construction works and heating, ventilation, air conditioning equipments.

18/03/202218/03/2023
1 - 3Next
Follow
javascript: SP.SOD.executeFunc('followingcommon.js', 'FollowDoc', function() { FollowDoc('{ListId}', {ItemId}); });
0x0
0x0
ContentType
0x01
1100
Compliance Details
javascript:if (typeof CalloutManager !== 'undefined' && Boolean(CalloutManager) && Boolean(CalloutManager.closeAll)) CalloutManager.closeAll(); commonShowModalDialog('{SiteUrl}'+ '/_layouts/15/itemexpiration.aspx' +'?ID={ItemId}&List={ListId}', 'center:1;dialogHeight:500px;dialogWidth:500px;resizable:yes;status:no;location:no;menubar:no;help:no', function GotoPageAfterClose(pageid){if(pageid == 'hold') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/hold.aspx' +'?ID={ItemId}&List={ListId}'); return false;} if(pageid == 'audit') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/Reporting.aspx' +'?Category=Auditing&backtype=item&ID={ItemId}&List={ListId}'); return false;} if(pageid == 'config') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/expirationconfig.aspx' +'?ID={ItemId}&List={ListId}'); return false;}}, null);
0x0
0x1
ContentType
0x01
898
Document Set Version History
/_layouts/15/images/versions.gif?rev=40
javascript:SP.UI.ModalDialog.ShowPopupDialog('{SiteUrl}'+ '/_layouts/15/DocSetVersions.aspx' + '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
330
Send To other location
/_layouts/15/images/sendOtherLoc.gif?rev=40
javascript:GoToPage('{SiteUrl}' + '/_layouts/15/docsetsend.aspx' + '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
350

 Job opportunities

Title
  
Location
  
Contact E-Mail Address
  
Project Assistant R&D 60-80% - Bellinzona-GiubiascoNew
  
Bellinzona-GiubiascoInterested candidates are requested to send their application to our Human Resources Department:  [email protected]  
Chief Project Engineer (M/F/X) - Brussels, Belgium
  
Brussels, Belgium[email protected]
Chief Project Engineer (M/V/X) - Brussels, Belgium
  
Brussels, Belgium[email protected]
1 - 3Next
Follow
javascript: SP.SOD.executeFunc('followingcommon.js', 'FollowDoc', function() { FollowDoc('{ListId}', {ItemId}); });
0x0
0x0
ContentType
0x01
1100
Compliance Details
javascript:if (typeof CalloutManager !== 'undefined' && Boolean(CalloutManager) && Boolean(CalloutManager.closeAll)) CalloutManager.closeAll(); commonShowModalDialog('{SiteUrl}'+ '/_layouts/15/itemexpiration.aspx' +'?ID={ItemId}&List={ListId}', 'center:1;dialogHeight:500px;dialogWidth:500px;resizable:yes;status:no;location:no;menubar:no;help:no', function GotoPageAfterClose(pageid){if(pageid == 'hold') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/hold.aspx' +'?ID={ItemId}&List={ListId}'); return false;} if(pageid == 'audit') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/Reporting.aspx' +'?Category=Auditing&backtype=item&ID={ItemId}&List={ListId}'); return false;} if(pageid == 'config') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/expirationconfig.aspx' +'?ID={ItemId}&List={ListId}'); return false;}}, null);
0x0
0x1
ContentType
0x01
898
Document Set Version History
/_layouts/15/images/versions.gif?rev=40
javascript:SP.UI.ModalDialog.ShowPopupDialog('{SiteUrl}'+ '/_layouts/15/DocSetVersions.aspx' + '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
330
Send To other location
/_layouts/15/images/sendOtherLoc.gif?rev=40
javascript:GoToPage('{SiteUrl}' + '/_layouts/15/docsetsend.aspx' + '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
350

ISO certifications

The Lombardi Group is ISO 9001, ISO 14001 and ISO 45001 certified
ISO 9001 ISO 14001 ISO 45001
Lombardi SA © 2014 | Privacy Policy  -  Cookie Policy | Sign in
Partner's Area CH | Partner's Area IT